Olympic Park Avenue, London

Olympic Park Avenue is a civic corridor where Stratford's Olympic legacy, sporting ambition, environmental renewal, and contemporary urban planning continue defining one of East London's most significant public streets.

Running through Stratford between Hackney Wick and East Village, the corridor connects sporting venues, landscaped parkland, residential quarters, educational institutions, and public spaces established through the comprehensive redevelopment of the Lower Lea Valley for the London 2012 Olympic and Paralympic Games. Broad pedestrian routes, granite paving, engineered planting, sustainable drainage, and contemporary public infrastructure reflect one of Britain's largest twenty-first-century regeneration programmes. National sporting venues, cultural destinations, and community facilities continue reinforcing the corridor's enduring civic role. The result is an experience shaped by engineering achievement, environmental recovery, and long-term urban investment.

Olympic Park Avenue is best known for forming part of the street network created for the Queen Elizabeth Olympic Park, whose development began after London secured the 2012 Olympic and Paralympic Games on 6 July 2005 following the International Olympic Committee vote in Singapore, initiating one of Europe's largest urban regeneration programmes across approximately 246 hectares of former industrial land within the Lower Lea Valley. Construction involved the remediation of more than two million tonnes of contaminated soil, the demolition or relocation of over 200 industrial businesses, restoration of extensive waterways including the River Lea and City Mill River, and delivery of permanent sporting venues including the London Stadium, London Aquatics Centre designed by Dame Zaha Hadid, Lee Valley VeloPark, and the Copper Box Arena, alongside new bridges, highways, utility networks, and flood protection infrastructure. Olympic Park Avenue developed as part of this comprehensive masterplan led by the Olympic Delivery Authority, with urban design by EDAW, landscape architecture by James Corner Field Operations, and engineering contributions from firms including Arup, establishing connected neighbourhoods, pedestrian routes, ecological corridors, and public spaces intended for long-term residential and civic use following the Games. Responsibility for the district transferred to the London Legacy Development Corporation in 2012, which has overseen continuing expansion of East Bank, educational campuses, housing, commercial development, and public amenities while preserving the Olympic Park's original spatial framework and environmental objectives.

East Bank introduced entirely new institutions including V&A East, Sadler's Wells East, the BBC Music Studios, and University College London's UCL East campus, extending the park's role beyond international sport into higher education, broadcasting, performing arts, and museum collections. The ArcelorMittal Orbit, designed by Sir Anish Kapoor and Cecil Balmond, opened in 2012 as Britain's tallest sculpture at approximately 114.5 metres and added the world's longest tunnel slide in 2016, contributing another engineering feature unique to the park. The London Aquatics Centre permanently reduced its Olympic seating capacity from roughly 17,500 spectators to about 2,500 following post-Games reconfiguration, fulfilling legacy commitments established during bid planning. The London Legacy Development Corporation continues coordinating development across neighbourhoods including East Wick, Sweetwater, Pudding Mill, Marshgate Wharf, and Stratford Waterfront under a long-term framework extending into the 2030s.

Olympic Park Avenue is best experienced as an exploration of Stratford's Olympic legacy, environmental renewal, and contemporary architecture.

Begin at London Stadium, where the principal venue of the 2012 Olympic and Paralympic Games introduces the scale of the Lower Lea Valley transformation before following the surrounding avenues. Continue to London Aquatics Centre, whose sweeping roof designed by Dame Zaha Hadid reflects one of the defining architectural commissions of the Games while explaining the site's long-term community legacy. Conclude at The ArcelorMittal Orbit, where panoramic views and advanced structural engineering provide a fitting finale examining the broader redevelopment of Queen Elizabeth Olympic Park. The progression moves naturally from the principal Olympic venue to pioneering aquatic architecture before concluding with Britain's tallest sculpture overlooking the regenerated Lower Lea Valley.

MAKE IT REAL

Start the planning journey with Foresyte Travel.
Experience immersive stories crafted for luxury travelers.

SEARCH

GET THE APP

Read the Latest:

Daytime aerial view of the Las Vegas Strip with Bellagio Fountains and major resorts.

Itinerary Inspiration

Perfect weekend in Las Vegas

Read now
Illuminated water fountains in front of the Bellagio Hotel in Las Vegas

Fascinations

Fun facts about Las Vegas

Read now
<< Back to news page
Right Menu Icon